The construction project located in Usak consists of the installation of the sewage system throughout the city. With a total line length of 370 km, the project has 4 elevation centers. The project has a total flow rate of 1.970 l/sec.
Technical Specifications >>| Client | General Directorate of İller Bank |
| Location | Uşak (City Center) |
| Total Line Length | 370 km |
| Pipe Type | Concrete (Inner Diameter = 150 mm-1 800 mm) |
| Pumping Stations | 4 |
| Total Discharge Capacity | 1 970 lt/sec |