The construction project located in Usak consists of the installation of the sewage system throughout the city. With a total line length of 370 km, the project has 4 elevation centers. The project has a total flow rate of 1.970 l/sec.

Technical Specifications >>
ClientGeneral Directorate of İller Bank
LocationUşak (City Center)
Total Line Length370 km
Pipe TypeConcrete (Inner Diameter = 150 mm-1 800 mm)
Pumping Stations4
Total Discharge Capacity1 970 lt/sec