MOTORWAYS AND HIGHWAYS

Erdemli- Silifke- Taşucu Border of The 13th Region Road

The Erdemli-Silifke-Taşucu Road Project has been constructed by Özaltın Construction in order to improve the transportation network in Mersin area.

The construction of the project of which contract signed in April 2013 are being carried out expeditiously.

Client

General Directorate of Highways, 5th Regional Directorate in Mersin

Contractor Özaltın Construction Co., Inc.
Location Erdemli- Silifke- Taşucu Section Road Length 33,730 km
Number of Tunnels 4 Length of Tunnels 3.300 m
Scope of Project *Construction of concrete lining and electromechanical works for the Karayar Tunnel (Twin Tube, 1.015 m)
*Construction of the 480- m T1 Tunnel (Twin Tube, 240 m)
*Construction of the 1.440- m T2 Tunnel (Twin Tube, 720 m)
*Construction of the 400- m T3 Tunnel (Twin Tube, 200 m)
*Construction of one interchange
*Construction of 33 km of Hot Bituminous Mixture
*Traffic marking and construction of road parapet
- -