MOTORWAYS AND HIGHWAYS

Kastamonu – İnebolu Road

The project of which contract was signed in August 2017 is planned to be completed towards the end of 2021.

 

Client General Directorate of Highways Contractor Joint Venture (Özaltın 30%)
Location Kastamonu – İnebolu Length of Road

38,748 km

Number of Cable-Stayed Bridge 1 Length of Cable-Stayed Bridge 490,18 m
Number of Post-tension Bridge 3 Length of Post-tension Bridges 260 m
Number of Prestressed Beam Bridges 2 Length of Prestressed Beam Bridges 132,80 m
Total Excavation Volume 3.446.231 m3 Total Tunnel Excavation Volume 2.969.517 m3
Total Fill Volume 2.250.000 m3 - -