Cindere Dam & HEPP

Cindere Dam and HEPP located in Denizli were constructed on Büyük Menderes river. As a Roller Compacted Concrete Dam, Cindere Dam has a body volume of 1.950.000 m3. The dam was constructed for energy generation and irrigation purposes. With an installed capacity of 30 MW, the dam has a total annual power generation capacity of 100 GWh and an irrigation capacity of 16.000 ha.

Technical Specifications >>

Client

General Directorate of

State Hydraulic Works (DSİ)

Location

Denizli

River

Büyük Menderes (Maeander)

Type

Roller Compacted Concrete (RCC)

Purpose of the Project

Energy + Irrigation

Body Volume (RCC)

1 950 000 m3

Reservoir Volume

94 x 106 m3

Height from Foundation

115 m

Height from Riverbed

85 m

Crest Length

300 m

Number of Diversion Tunnels

1

Length of Diversion Tunnel

783 m

Inner Diameter of 
Diversion Tunnel

5 m

Design Discharge of Spillway

3 600 m3/sec

Installed Capacity

30 MW

Number of Units

3 + 1

Annual Power Generation

100 GWh

Irrigation Area

16 000 ha

Excavation Volume

5 800 000 m3

Conventional Concrete Volume

370 000 m3

Total Drilled Grouting Holes

29 300 m

Length of State Highway Relocation

26 km