Lower Kaleköy Dam and HEPP (Construction)

  • 01 Asagi Kalekoy Havadan 2021 0194
  • 02 Asagi Kalekoy Havadan 2021 0199
  • 03 Asagi Kalekoy Havadan 2021 0198
  • 04 Asagi Kalekoy Havadan 2021 0031
  • 05 Asagi Kalekoy Havadan 2021 0014
  • 06 Asagi Kalekoy Havadan 2021 0155
  • 07 Asagi Kalekoy Havadan 2021 0010
  • 08 Asagi Kalekoy Havadan 2021 0201
  • 09 Asagi Kalekoy Havadan 2021 0222
  • 10 Asagi Kalekoy Havadan 2021 0237
  • 11 Asagi Kalekoy Havadan 2021 0334
  • 12 Asagi Kalekoy Havadan 2021 0336
  • 13 Asagi Kalekoy Havadan 2021 0340
  • 14 Asagi Kalekoy Havadan 2021 0341
  • 15 Asagi Kalekoy Havadan 2021 0342
  • 16 Asagi Kalekoy 2021 0185
    FACTS & FIGURES
    Client:

    Kalehan Energy Company

    Location:

    Bingöl, TÜRKİYE

    Contractor:

    Özaltın-Cengiz Joint Venture

    Dam Type:

    Composite

    Rock-Fill Volume:

    3,700,000 m3

    Height from Foundation:

    110 m

    Crest Length:

    945 m

    Installed Capacity:

    500.10 MW

    Annual Power Generation:

    1,780 GWh

    The project involved the construction of the 500.10 MW Lower Kaleköy generating station is located on the Murat River, in Bingöl province of eastern Türkiye.

    The dam consists of a 510-meter long water impermeable asphalt core rock-fill embankment on the left bank of the river, and a 435-meter long concrete gravity section which extends to the right abutment, constitute a composite length of 945 meters with a height of 110 meters. The concrete portion of the dam comprises a roller-compacted-concrete (RCC) gravity structure which incorporates an integral concrete-lined spillway in the middle controlled by six (6) radial gates with a discharge capacity of 9,300 m3/s, and a frontal water intake located on an excavated ground at the right abutment.

    The river diversion entailed the excavation of two (2) tunnels, 510 meters and 521 meters long, excavated to a diameter of 11 meters, and lined with reinforced concrete to a final diameter of 9.5 meters respectively.

    Almost 7 million cubic meters of rock and earth were excavated for the foundations of the dam, including the spillway, intake structures, powerplant, and diversion tunnels. About 380,000 m3 conventional concrete were utilized for these permanent structures. More than 3,700,000 m3 of material were required to build the rock-fill embankment, and a total of 1,900,000 m3 of roller-compacted-concrete (RCC), were placed for the concrete gravity section to form the composite dam.

    The scope also included the construction of the semi-underground powerplant with the installation of three (3) vertical shaft Francis-turbine generator units and one (1) eco-flow unit, with a total installed capacity of 500.10 MW.