|
|
Dernah Infrastructure Project
It involves all infrastructure construction works throughout the city of Dernah, Libya. The project consists of 1.000 km long wastewater, stormwater and drinking water pipeline construction, renewal of the telecom and electric networks of the entire city and an approximately 380 km long urban road construction and landscaping works. |
|
|
Wastewater Treatment Plant
The treatment plant located in Antalya was installed with the Biological Treatment and Activated Sludge Method. The treatment plant has the capacity of serving a population of 500.000. |
|
|
Uşak (City Center) Sewage Construction
The construction project located in Usak consists of the installation of the sewage system throughout the city. With a total line length of 370 km, the project has 4 elevation centers. The project has a total flow rate of 1.970 l/sec. |
|
|
Karataş Irrigation
Karataş irrigation system located in Burdur was constructed on Bozçay Karataş Lake. With a 170 km long main channel, Karataş irrigation system has a capability of irrigating an area of 17.000 hs. |
© 2013, Özaltın Holding
site map | privacy policy | terms of service