ENERGY

KALEHAN ENERGY

Beyhan I Dam and HEPP

The construction of the Beyhan I Dam and HEPP has been completed by Kalehan Beyhan Energy Generation Co., Inc. of which Özaltın is holding %50 of share and energy generation has been started in March 2014.

The Beyhan I Dam and HEPP having installed capacity of 582 MW is planned to produce 1.3 billion KWh energy per year.

Detail

Beyhan II Dam and HEPP

The civil works of the Beyhan II Dam and HEPP constructed by Kalehan Murat Energy Generation Co., Inc. with Özaltın Construction holding %50 shares in are carried on as scheduled.

 

Detail

Yukarı Kaleköy Dam and HEPP

Yukarı Kaleköy Dam and HEPP, which is built by Kalehan Kale Enegy Generation Co., Inc. 50% of which is owned by Özaltın Construction, owns the title of the biggest dam project realized by private sector in Turkey.

The dam, being completed by 90% by January 2017 is planned to produce energy by December 2017.

Detail

Aşağı Kaleköy Dam and HEPP

The construction of the Aşağı Kaleköy Dam and HEPP project is started to be constructed by Kalehan Genç Energy Generation Co., Inc. of which Özaltın holding 50% shares, it is planned to produce energy within 2019.

 

Detail

Gözeler II Diversion Weir and HEPP

Gözeler II Diversion Weir and HEPP project is planned to be constructed by Kalehan Gözeler Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 67.41 MW is planned to produce 172 million KWh energy per year when completed.

Detail

Gözeler III Diversion Weir and HEPP

The Gözeler III Diversion Weir and HEPP project planned to be constructed by Kalehan Gözeler Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 70,02 MW is planned to produce yearly 173 million KWh energy per year when completed.

Detail

Palu I Diversion Weir and HEPP

Palu I Diversion Weir and HEPP Project is planned to be constructed by Kalehan Murat Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

Detail

Palu II Diversion Weir and HEPP

Palu II Diversion Weir and HEPP Project is planned to be constructed by Kalehan Murat Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

Detail