KALEHAN ENERGY

Beyhan II Dam and HEPP

Beyhan II Dam and HEPP project is planned to be constructed by Kalehan Murat Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 264 MW is planned to produce 565 million KWh energy per year when completed.

Client Kalehan Murat Energy Generation Co., Inc. Contractor Joint Venture (Özaltın %50)
Location Elazığ River Fırat (Euphrates)
Type Concrete Gravity Purpose of the Project Energy
Body Volume (RCC) 232.000 m3 Gross Head 35 m
Reservoir Volume 78,92 x 106 m3 Height from Foundation 62 m
Height from Riverbed 41,8 m Crest Length 360 m
Number of Diversion Canals 1 Lenght of Diversion Canal 578 m
Expansion of Diversion Canal 25 m Design Discharge of Spillway 7.436 m3/sec
Installed Capacity 264 MW Number of Units 4
Annual Power Generation 565,1 GWh Excavation Volume 4.000 000 m3
Conventional Concrete Volume 1.342.000 m3 Total Drilled Grouting Holes 60.000 m