TRANSPORTATION

PROJECTS

Gebze - Orhangazi - İzmir (Including The Osmangazi Bridge And Access Roads) Motorway Build- Operate- Transfer Project

The total length of the motorway project linking the two major cities in Turkey İstanbul to İzmir, is 433 km including access roads. When completed, the current 2,5-3 hour travel time between İstanbul and Bursa will be reduced to 1 hour, current travel time between from İstanbul to İzmir will be reduced from 8-10 hour to 3,5-4 hours and from İstanbul to Eskişehir will be 2-2,5 hours.

Also, in the scope of the project, İzmit Bay Crossing Bridge, renamed as the Osmangazi Bridge, the most important part of the project, was constructed. Approximately 52.5 km motorway section, together with the Osmangazi Bridge, has been put into service on 30 June 2016.

The Osmangazi Bridge having length of 2.907 m and a having main span length of of 1.550 m ranks 4th among the suspension bridges with the largest span in the world.

Detail