Click on pictures to enlarge |
|
|
|
Client |
General Directorate of
State Hydraulic Works (DSİ) |
|
Location |
İzmir |
|
River |
Küçük Menderes (Little Maeander) |
|
Type |
Roller Compacted Concrete (RCC) |
|
Purpose of the Project |
Irrigation |
|
Body Volume (RCC) |
2 700 000 m3 |
|
Reservoir Volume |
300 x 106 m3 |
|
Height from Foundation |
100 m |
|
Height from Riverbed |
60 m |
|
Crest Length |
785 m |
|
Number of Diversion Tunnels |
1 |
|
Length of Diversion Tunnel |
770 m |
|
Inner Diameter of Diversion Tunnel |
5 m |
|
Design Discharge of Spillway |
1 275 m3/sec |
|
Irrigation Area |
22 000 ha |
|
|
|
Excavation Volume |
3 700 000 m3 |
|
Conventional Concrete Volume |
230 000 m3 |
|
Total Drilled Grouting Holes |
20 000 m |
|
Lenght of State Highway Relocation |
17 km |
|