Click on pictures to enlarge |
|
|
|
Client |
General Directorate of
State Hydraulic Works (DSİ) |
|
Location |
Denizli |
|
River |
Büyük Menderes (Maeander) |
|
Type |
Roller Compacted Concrete (RCC) |
|
Purpose of the Project |
Energy + Irrigation |
|
Body Volume (RCC) |
1 950 000 m3 |
|
Reservoir Volume |
94 x 106 m3 |
|
Height from Foundation |
115 m |
|
Height from Riverbed |
85 m |
|
Crest Length |
300 m |
|
Number of Diversion Tunnels |
1 |
|
Length of Diversion Tunnel |
783 m |
|
Inner Diameter of Diversion Tunnel |
5 m |
|
Design Discharge of Spillway |
3 600 m3/sec |
|
Installed Capacity |
30 MW |
|
Number of Units |
3 + 1 |
|
Annual Power Generation |
100 Gwh |
|
Irrigation Area |
16 000 ha |
|
|
|
Excavation Volume |
5 800 000 m3 |
|
Conventional Concrete Volume |
370 000 m3 |
|
Total Drilled Grouting Holes |
29 300 m |
|
Lenght of State Highway Relocation |
26 km |
|