HIGHWAYS

Antalya – Kemer – Tekirova Road

The construction process of the project carried out by Özaltın İnşaat has been completed and the project has been put into service.

 

Client

General Directorate of Highways, 12th Regional Directorate in Antalya

Contractor

Özaltın Construction Co., Inc.

Location Antalya–Kemer–Tekirova Section Length of Road

52 Km (Bituminous Hot Mix Pavement )

Number of Tunnels 1 (Phaselis Tunnel) Length of Tunnel 2.500 m (Twin Tube, 1.250 m)
Number of Interchanges 1 (Kemer) Length of Interchange 128 m