HIGHWAYS

Antalya – Korkuteli – Söğüt Border of the 2nd Region Road

The construction of the project of which contract signed in January 2017, is planned to be completed in mid 2020.

 

Client

General Directorate of Highways

Contractor

Joint Venture (Özaltın %50)

Location Antalya-Korkuteli-Söğüt Section Length of Road

99,18 km

Scope of Project

*Reconstruction of 99,18 km pavement
                       *Fabrication of various small engineering structures.

- -