HIGHWAYS

Erdemli – Silifke – Taşucu Border of the 13. Region Road, Yeşilova – Aydıncık Section

The project of which contract was signed in August 2017 is planned to be completed towards the end of 2019.

 

Client General Directorate of Highways, 5th Regional Directorate in Mersin Contractor Özaltın Construction Co., Inc.
Location Erdemli-Silifke-Taşucu Length of Road

28,51 km

Number of Tunnels    5 Tunnel Length 10.905 m (Twin Tube, 5.452,5 m)
Total Excavation Volume 665.400 m3 Total Tunnel Excavation Volume 2.416.600 m3