RAILWAYS

Palu- Genç- Muş Railway Project

The project where the contract was signed in December 2011 is being carried out by a joint venture including Özaltın Construction as a member.

The project is planned to be completed by the end of the year 2018.

Client

Republic of Turkey, General Directorate of State Railways

Total Number of Tunnels 68
Route Palu- Genç- Muş (East Side of Turkey) Track Length 114 km
Total Length of Tunnels 23.593 m Number of Cut- Cover Tunnels 111
Total Length of Cut- Cover Tunnels 13.059 m Number of Bridges and Viaducts 58
Total Excavation Volume 22.895.871 m3 Total Excavation-Fill Volume 27.957.183 m3