ENOVA ENERJİ

Ceyhan I Dam and HEPP

Construction of the Ceyhan I Dam and HEPP by Enova Energy Generation Co., Inc., 50% of which is owned by Özaltın Construction, was started in in December 2007 and completed in June 2010; the dam has started to generate power.

 

Client Enova Energy Generation Co., Inc. Contractor Joint Venture (Özaltın %50)
Location Osmaniye River Ceyhan
Purpose of the Project Energy Gross Head 10,5 m
Installed Capacity 24,6 MW Annual Power Generation 97 GWh