KALEHAN ENERGY

Beyhan II Dam and HEPP

The civil works of the Beyhan II Dam and HEPP constructed by Kalehan Murat Energy Generation Co., Inc. with Özaltın Construction holding %50 shares in are carried on as scheduled.

 

Client Kalehan Murat Energy Generation Co., Inc. Contractor Joint Venture (Özaltın %50)
Location Elazığ River Fırat (Euphrates)
Type Concrete Gravity Purpose of the Project Energy
Body Volume (RCC) 232.000 m3 Gross Head 35 m
Reservoir Volume 78,92 x 106 m3 Height from Foundation 62 m
Height from Riverbed 41,8 m Crest Length 360 m
Number of Diversion Canals 1 Lenght of Diversion Canal 578 m
Expansion of Diversion Canal 25 m Design Discharge of Spillway 7.436 m3/sec
Installed Capacity 264 MW Number of Units 4
Annual Power Generation 565,1 GWh Excavation Volume 4.000 000 m3
Conventional Concrete Volume 1.342.000 m3 Total Drilled Grouting Holes 60.000 m