KALEHAN ENERGY

Palu II Diversion Weir and HEPP

Palu II Diversion Weir and HEPP Project is planned to be constructed by Kalehan Murat Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 145,1 MW is planned to produce 254 million KWh energy per year when completed.

Client Kalehan Murat Energy Generation Co., Inc. Contractor Joint Venture (Özaltın 50%)
Location Elazığ River Murat
Type Roller Compacted Concrete (RCC) Body Volume (RCC) 30.000 m3
Purpose of the Project Energy Height from Foundation 24,9 m
Installed Capacity 145,1 MW
 
Annual Power Generation 254 GWh