Kiğı Dam and HEPP

  • 01 Kigi Hava 2019 0051
  • 02 Kigi Hava 2019 0059
  • 03 Kigi Hava 2019 0069
  • 04 Kigi Hava 2019 0086
  • 05 Kigi Hava 2019 0054
  • 06 Kigi Hava 2019 0045
  • 07 Kigi Hava 2019 0052
  • 08 Kigi Hava 2019 0063
  • 09 Kigi Hava 2019 0091
  • 10 Kigi Hava 2019 0055
  • 11 Kigi Baraji Ve Hes (4)
  • 12 Kigi Baraji Ve Hes (3)
  • 13 Kigi Baraji Ve Hes
  • 14 Kigi Baraji Ve Hes (2)
    FACTS & FIGURES
    Location:

    Bingöl, TÜRKİYE

    Client (Owner):

    General Directorate of State Hydraulic Works (DSİ)

    Type of Contract:

    Unit Price

    Dam Volume:

    23,000,000 m3

    Crest Length:

    585 m

    Height from Foundation:

    175 m

    Installed Capacity:

    180 MW

    Annual Power Generation:

    650 GWh

    Project Status:

    Completed

    The Kiğı hydropower project (HPP) was designed to harness the power of Peri River in highland of Bingöl province of eastern Türkiye, using a hydraulic gross head of 218 meters by virtue of its water storage dam, and its associated headrace tunnel.

    The main structure of the project is a 23,000,000 m3 central clay-core rock-fill embankment dam, which is 147-meter tall from the stream bed and has a crest length of 585 meters. It is impounding a reservoir with a capacity of 570 million cubic meters of water. The radial-gated spillway has a capacity of 4,500 m3/s and is located on an excavated ground at the left abutment. Two (2) concrete-lined tunnels, 1,385 meters and 1,278 meters in length and with an internal diameter of 5 meters respectively were built for the river diversion flow. In addition, and as part of the project scope, a horizontal head race tunnel measuring 8,135 meters and having a diameter of 5.5 meters along with a concrete lined, 112-meter tall vertical cylindrical surge tank with an internal diameter of 10 meters, and a 100 meter-tall concrete-lined pressure shaft with an internal diameter of 5 meters were built to create a high head for the available hydraulic energy. This is achieved by transferring water flow through a head race tunnel system from a concrete-lined, 76-meter tall vertical intake shaft located in the dam that has an 11.40 by 9.5 meters rectangular cross section, into a semi-underground powerhouse, located at the base of the escarpment, and which is equipped with three (3) Francis turbine-generator units with a total installed capacity of 180 MW.

    Construction of the Kiğı Dam and HEPP was launched in 2010. The dam was impounded in 2015 and fully commissioned in 2017