    FACTS & FIGURES
    Client:

    Slovenian State Railways Company 2TDK

    Contractor:

    Kolektor-Yapı Merkezi-Özaltın Joint Venture

    Location:

    Crni Kal-Koper Section, SLOVENIA

    Length of Railway:

    11.1 km

    Number of Tunnels:

    9

    Length of Tunnels:

    11,858 m

    Number of Viaducts:

    2 (1,099 m)

    The new railway line, that is an integral part of the Trans-European Transport Network, connects the Koper Port to Divaca Town in Slovenia. It is designed to be 27.1-kilometer long, with a double-track line and a speed capacity of up to 160 km/h. This new line primarily aims to facilitate international railway transport while also diverting freight transportation from highway to a more efficient and higher capacity modern railway track resulting in shorter transportation times. Lot 2 part of the project encompasses a 11.1-kilometer section between Črni Kal and Koper, focusing on the completion of tunnels spanning a total of 11,858 meters and 2 viaducts with a maximum foot height of 64 meters. The construction works of Lot 2 commenced in 2021, with an anticipated project completion date set for 2024.