Upper Kaleköy Dam and HEPP Energy Transmission Line

  • 01 Yukari Kalekoy Baraji Ve Hes Enerji Iletim Hatti 1 Rvz
  • 02 Yukari Kalekoy Baraji Ve Hes Enerji Iletim Hatti
  • 03 Yukari Kalekoy Baraji Ve Hes Enerji Iletim Hatti
    FACTS & FIGURES
    Client:

    General Directorate of Turkish Electricity Transmission Corporation (TEİAŞ)

    Investor:

    Kalehan Kale Energy Generation Co., Inc.

    Location:

    Bingöl – Elazığ, TURKEY

    Length of the Line:

    29 km + 64 km = 93 km

    Number of Towers:

    67 + 143 = 210

    Total Weight of Towers:

    1140 tons + 2638 tons = 3778 tons

    Status:

    In operation

    Two energy transmission lines have been constructed within the scope of this project. Through the first line, the energy transmission is transferred between 380 kV Upper Kaleköy Dam and HEPP – Lower Kaleköy Dam and HEPP; and through the second line, the energy transmission is transferred between 380 kV Lower Kaleköy Dam and HEPP – Beyhan I Dam and HEPP.