Gebze - Orhangazi - İzmir Motorway, Gebze - Orhangazi Section, Part 3

  • 01 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 02 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 03 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 04 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 05 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 06 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 07 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 08 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 09 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 10 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 11 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 12 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 13 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 14 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 15 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 16 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 17 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 18 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 19 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
  • 20 Gebze Orhangazi Izmir Otoyolu Gebze Orhangazi Kesimi Kisim 3
    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Concession Company:

    Otoyol Investment and Operation Co.

    Construction Company:

    NÖMAYG Joint Venture Company

    Subcontractor:

    Özaltın-Yüksel Joint Venture

    Location:

    Tavşanlı-Yalova Section, TÜRKİYE

    Length of Motorway:

    11.50 km

    Platform Width:

    35.5 m (2x3 Motorway)

    Pavement Type:

    Asphalt Pavement

    The project includes the construction of the section between Km: 19+213-Km: 30+700 of The Gebze-Orhangazi-İzmir Motorway Project (Including the Osmangazi Bridge and Access Roads) tendered as a Build-Operate-Transfer model. The 2x3 lane motorway with a length of approximately 11.5 kilometers and a platform width of 35.5 meters were completed and inaugurated on December 31st, 2015.

    Within the scope of the project, 11 million m3 of excavation and 3.6 million m3 of filling works, 3 viaducts, 4 bridges, 7 underpass bridges, 10 culverts construction works, and 0.55 million tons of cold-mix works, 283 thousand tons of hot-mix asphalt pavement works were finalized.