INFRASTRUCTURE

Wadı Arab Water System II Project

The contract of the Wadi Arab project to be constructed by the partnership in which Özaltın Construction is a member was signed in December 2016.

The project is planned to be completed by the end of the year 2018.

Client

Kingdom of Jordan, Ministry of Water and Irrigation

Contractor

Joint Venture (Özaltın %50)

Location Jordan Units of the Main Facilities

Water Treatment Station with a capacity of 30 x 106 m³/year                   
25,6 km Long Pipeline having a Diameter of Ø1000 mm
3 Pump Stations 

Water Treatment Facilities

Water Intake Structure
Presedimentation and Sedimentation Basins
Filter Structure
Chemical Feed Structures
Dewatering Structure
Gravity Thickeners & Influent Distribution Box
Thickened Solids Pump Station, Thickened Sludge Storage
Sludge Drying Beds
Metering Stations
Surge Tanks

- -