KALEHAN ENERGY

Gözeler II Diversion Weir and HEPP

Gözeler II Diversion Weir and HEPP project is planned to be constructed by Kalehan Gözeler Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 67.41 MW is planned to produce 172 million KWh energy per year when completed.

Client Kalehan Gözeler Energy Generation Co., Inc. Contractor Joint Venture (Özaltın 50%)
Location Bingöl River Murat
Type Roller Compacted Concrete (RCC) Body Volume (RCC) 199.000 m3
Height from Foundation 16 m
Installed Capacity
69, 3 MW
Annual Power Generation 172,9 GWh - -