KALEHAN ENERGY

Palu I Diversion Weir and HEPP

Palu I Diversion Weir and HEPP Project is planned to be constructed by Kalehan Murat Energy Generation Co., Inc. of which Özaltın Construction holding %50 shares, is currently at the design stage and the construction has not begun, yet.

The dam with an installed capacity of 72,9 MW is planned to produce 135,03 million KWh energy per year when completed.

Client Kalehan Murat Energy Generation Co., Inc. Contractor

Joint Venture (Özaltın 50%)

Location Elazığ River Murat
Type

Roller Compacted Concrete (RCC)

Purpose of the Project Energy
Body Volume (RCC) 15.200 m3 Height from Foundation 29,4 m
Installed Capacity 72,9 MW
 
Annual Power Generation 135,03 GWh